Project: Woods View  Development
Client: Capstone Homes


The site consists 12 acres of 41 lot plats and a community park, in Port Orchard. RV Associates providing a turn key project for the owner to include earthwork, utilities, site work and paving.

THE COMPLEXITY OF PROJECTS IS A TESTAMENT TO OUR EXPERIENCE AND INGENUITY


Project: Silverdale Harrison Hospital and Parking Garage

General Contractor: Balfour Beatty LLC dba Howard S Wright
Owner: Harrison Medical Center


This project consists of multiple facets. The Parking Garage will be a 788 stall parking structure as well as the 472,000 sq ft expansion of the existing medical center. RV is handling the earthwork and site development prep prior to structure building.

Project: Peacock Hill Improvements
Client: Olympic Property Group


This project consists of improvements to the existing road of Peacock Hill in Gig Harbor. With all of the growth and community development the roadway also needs to improve. The improvements include addition of street and walkway lighting as well as landscaping.

Project: The Trails at Silverdale
Client: Robinson  Construction


The site consists of over 30 acres of land located in the heart of Kitsap County retail corridor. The project consists of approximately 200,000 square feet of retail. RV Associates handled the under ground utilities in addition to foundation excavation, sub grade and prep work for building construction.

Project: McCormick Woods Development
Client: McCormick Communites LLC


The site consists 170 lot plats, in Port Orchard. RV Associates providing a turn key project for the owner to include earthwork, utilities, site work and paving.

Project: Harbor Hills Development
Client: Harbor Hill LLC.


Our work began in 2011 and continues today, on the Harbor Hill Development in Gig Harbor. RV Associates is providing to the owner a turn key property to include all under ground utilities including all storm, water lines. As well as street light, roads, walking paths and recreational areas.

OFFICE HOURS 

MONDAY - FRIDAY

7:30am - 5:00pm


GRAVEL PIT HOURS

MONDAY - FRIDAY 

7:30am - 3:00pm


Our extensive knowledge of geological conditions and sensitivity to the environment has allowed us to specialize in difficult utility installations, wetlands mitigation and foundation excavations, such as unpredictable shoring, support problems, unusual terrain and infrastructure interference. In essence, we anticipate potential issues before they occur and solve them with sound construction solutions and techniques.


Some of the techniques we employ are dewatering, foundation stabilization, soil control, trench work, creek diversion, and culvert placement in areas of subdivisions, industrial and commercial applications, and public land.